Michael Ellars

michaelellars.com

Michael Ellars, AIA, APX, CSI, CCCA, CDT, LEED AP, ADAC, CASp

Chapter 11B, Division 5 (General Site and Building Elements)

2018 CBC Revisions:
Intervening Code Cycle


Chapter 11B, Division 5 (General Site and BUilding Elements) 

11B-503.5 Vertical clearance. Vehicle pull-up spaces, access aisles serving them, and a vehicular route from an entrance to the passenger drop-off and loading zone and from the passenger drop-off and loading zone to a vehicular exit shall provide a vertical clearance of 114 inches (2896 mm) minimum.

Additional editorial clarification that passenger loading zones also allow for passenger drop-off. See also Division 2.